SITEOPS is a revolutionary, patent-pending, optimization software for the land development industry, developed by BLUERIDGE Analytics, Inc., Charlotte, NC.

SITEOPS reduces the time and cost associated with site development.  Site parameters such as the boundary line, existing contours, building footprint, parking requirements, geotech data, and numerous other factors are entered into the SITEOPS program.  SITEOPS will compute millions of separate layouts, grading plans, and storm water options, along with the cost of each scenario and deliver the most economical 5 designs in the form of an DWG file and an Excel spreadsheet detailing the costs. 

  • MESH Consulting is now selling subscriptions to civil engineers and developers for this optimization software. 
  • MESH is also able to offer site assessments for your land development project, using the SITEOPS platform. 
    To read the press release about our partnership with BLUERIDGE - click here [Press Release]
    For more information on SITEOPS, please visit www.siteops.com
    and call MESH today to learn more about the exciting product!

     
    SITEOPS optimizes the site design for the lowest possible site improvement cost.

Subtle adjustments to the Finished Floor Elevation, Grading, and Layout can SIGNIFICANTLY affect the overall site work cost.

Review the Example Below:

A 2.8 acre single pad site with existing contours sloping away from the road.  Using SITEOPS, we imported the property boundary, existing contours, and building pad.  SITEOPS drew the parking area and driveways.  SITEOPS provided numerous FFE and grading options, along with full cost estimates within minutes.

            

    




2.8 acre, single pad site.  
Existing contours are shown.
Driveway elevations at the roads are
394 FT and 398 FT.








 




In this design, we slope up from the road to the building pad at 2-3%. 
This puts the FFE at 400.5 FT
The site work costs are $938,563.



















Next, we have SITEOPS Optimize the grading on the site for the lowest possible cost.  SITEOPS outputs a FFE of 393.4 FT and a cost of $420,423.  

$500,000 Less than the first scenario!



















What if ... we wanted an FFE of 398 FT to be on the same elevation as the roads?  SITEOPS will compute this in minutes.

An FFE of 398 FT will have a site work cost of
$733,783

$200,000 less than the first scenario!

SITEOPS allows you to quickly and accurately assess the site development costs of different site design options.
Other What ifs?...
    
    What if we...
-                        Moved the building?
-                        Moved the driveways?
-                        Needed a different building pad?
-                        Needed to add gas pumps?
-                        Needed to tie into a storm sewer at a set location and elevation?
-                        Had geotech information?

All of these can quickly be assessed.  Please call us for a demonstration of this revolutionary product.